MANUFACTURING ENGINEERING
Production flow and shop layout
Equipment specifications
Nitrogen Blanket System Installation for multiple tanks
Demolition and installation of a new slab for replacement can stamping machine
Chiller replacement including new controls
Various platforms, equipment mounts, etc.
Various Overhead and Jib Crane installations
Fiberglass Panel Manufacturing Improvements
Developed a new panel curing system with both mechanical fixtures and PLC controls
Developed a semi-automatic measuring and mixing system for the resins and additives
Engineered a manufacturing process and products with a brand new thermoplastic material
Derrick Charbonnet, P. E. Principal
228-238-4789